Skip to content

Service · Fit-Out

Commercial Fit-Out Contractor in Dubai

Office and floor-plate fit-outs inside live towers, with consultant and authority coordination.

Request similar work WhatsApp us

By Updated Reviewed by the Technical Manager Registered with the Society of Engineers UAE and Abu Dhabi Municipality

Dubai Trade Licence No. 1277078 · ISO 9001 / 14001 / 45001

Completed commercial boardroom after a Beavcon fit-out
Commercial Fit-OutDubai · Abu Dhabi · UAE
What is included
  • Demolition and strip-out of existing fit-out
  • Gypsum and glazed partitions, doors and ironmongery
  • Specialty ceilings, acoustic and feature ceilings
  • Electrical, data containment, lighting and small power
  • HVAC modifications, VAV and FCU works, ducting and balancing
  • Firefighting and fire alarm tie-ins with civil defence approval
  • Flooring, carpet, wall finishes and joinery
  • Consultant submissions, authority approvals and close-out documentation

Fit-out inside live buildings

Most commercial fit-outs in Dubai and Abu Dhabi happen inside towers that are already occupied. The hard part is not the partitions or the ceilings; it is sequencing demolition, MEP tie-ins and firefighting works so that the floors above and below never notice. Beavcon has delivered three consecutive full-floor fit-outs at ADNEC Tower under exactly those conditions.

Engineering before pricing

Every fit-out enquiry is reviewed by a qualified engineer before it is priced. We read the consultant’s drawings against the landlord’s fit-out guide and the site as it actually is, then freeze a scope that names what is included, what is excluded and where provisional sums sit. That is the document the offer is measured against.

One contract, every trade

Partitions, specialty ceilings, electrical, HVAC, firefighting, automated glass, flooring and joinery are delivered under one contract with one accountable engineer. Consultant submissions, inspection requests and authority approvals are handled in-house, so the coordination burden stays with us rather than your facilities team.

Close-out that survives audit

Handover includes as-built drawings, test certificates, warranties and a snag list closed to zero. Government and corporate clients receive the file in the format their asset register needs.

For occupied commercial refurbishment in 2026 the same file should also hold the landlord NOC, fit-out permit and completion certificate, Civil Defence completion where fire systems changed, DEWA confirmation for load or water changes, TAB reports where HVAC was modified, O&M manuals and photographs of concealed services before closure. That list is written out in documented close-out for occupied buildings.

Target: qualified proposal within 48 hours for standard packages.

How the package runs
  1. 01

    Technical review

    Consultant drawings, landlord fit-out guide and site conditions reviewed by an engineer.

  2. 02

    Scope freeze

    BOQ checked line by line; gaps, exclusions and provisional sums agreed in writing.

  3. 03

    Priced proposal

    Rates, programme, phasing and payment terms issued as one document.

  4. 04

    Approvals

    Landlord, consultant and authority submissions handled in-house before mobilisation.

  5. 05

    Delivery and close-out

    Inspection requests, snag closure, as-builts, warranties and handover file.

Typical constraints we handle
  • Occupied towers with restricted working hours and goods-lift booking
  • Landlord fit-out guides and consultant approval gates
  • Live firefighting and BMS systems that cannot be isolated for long
  • Hard opening or lease commencement dates
Case studies for this package
Guides for this package
FAQ

Questions on commercial fit-out.

Yes. Most commercial fit-outs in Dubai and Abu Dhabi happen inside towers that are already occupied, and Beavcon delivered three consecutive full-floor packages at ADNEC Tower inside an operating, government-occupied building. Access, noise, dust and out-of-hours works are planned with building management before mobilisation. The live-building checks are set out in fit-out in an occupied tower.

Yes. The consultant's drawings and the landlord's fit-out guide are reviewed by an engineer before pricing. Submissions, material approvals, inspection requests and authority coordination are part of our scope, and one Beavcon engineer is your single point of contact, so the coordination stays with us rather than your facilities team. See what a fit-out contractor coordinates.

Yes. Send the BOQ and drawings through BuildScope. An engineer checks the quantities line by line and flags gaps, exclusions and provisional sums before the offer is issued, and the scope is frozen in writing so the final account is measured against it. The target is a qualified proposal within 48 hours for standard packages.

Single floors and multi-floor packages, typically between AED 250k and AED 2m including shell and core modifications. The three ADNEC Tower packages were full-floor fit-outs. Whatever the size, every fit-out enquiry is reviewed by a qualified engineer before it is priced, and the scope is frozen in writing before the offer is issued.

Handover includes as-builts, MEP and fire test certificates, warranties, a snag list closed to zero, photographs of concealed services, and the landlord, Civil Defence and utility records the building requires. Ask for a redacted example during prequalification. The full list is in documented close-out for occupied buildings.

For a live office floor we recommend one contract covering strip-out, partitions, MEP, HVAC, fire, glass and finishes under one accountable engineer. Split trades leave the interface defects and the approval register with you. The comparison, including when separate trades can still be rational, is in one contractor or separate trades.

In five steps: technical review of the consultant's drawings, the landlord's fit-out guide and the site conditions; scope freeze with the BOQ checked line by line; a priced proposal with rates, programme, phasing and payment terms in one document; landlord, consultant and authority approvals before mobilisation; then delivery with inspection requests, snag closure, as-builts, warranties and a handover file.

Four constraints: restricted working hours and goods-lift booking, landlord fit-out guides and consultant approval gates, live firefighting and BMS systems that cannot be isolated for long, and hard opening or lease commencement dates. We plan around them from the start and recommend writing the same rules into the RFQ, so the programme is honest before work begins.

BuildScope by Beavcon

Request similar work

Send us the commercial fit-out scope.

Work type is preselected. Upload drawings, BOQ or photos and an engineer reviews the package before it is priced.

How to use

Five steps. Pick a work type, then Next. Attach drawings if you have them. Submit on the last step.

  1. 01 Work type
  2. 02 Location
  3. 03 Details
  4. 04 Files
  5. 05 Your details
01 / 05 What kind of work is it?

Work type — what kind of package is this? Select one or more so it reaches the right estimator.

02 / 05 Where is the site?

Location — Dubai or Abu Dhabi. We mobilise to the other Emirates project by project.

03 / 05 Project details

Details — area, dates and budget. Approximate figures are fine — we confirm quantities on site.

04 / 05 Upload files

Files — drawings, BOQ or photos, optional.

    Executable files are rejected. Files are used only to prepare your quotation.

    05 / 05 How do we reach you?

    Your details — review and send. A reference is issued immediately; an estimator follows up.

    Preferred contact

    By submitting you agree to our privacy policy. Files and details are used only to prepare your quotation and are stored securely.

    01 / 05 · Work type — what kind of package is this?
    Related projects
    • Abu Dhabi · Commercial / Government · 2026

      ADNEC Tower — 2nd Floor

      Developer client · Full fit-out: demolition, partitions, specialty ceilings, electrical & HVAC, firefighting, automated glass, furniture & carpet

      Constraint
      Occupied tower; consultant and authority approvals on the critical path.
      Solution
      Single-point coordination of all trades plus consultant and authority submissions.
      Outcome
      Full floor handed over with close-out documentation.
    • Abu Dhabi · Commercial · 2025

      ADNEC Tower — 5th Floor

      Developer client · Full fit-out incl. demolition, partitions, specialty ceilings, electrical, HVAC, firefighting, automated glass, wall finishes

      Constraint
      Live tower — demolition and MEP works inside an operating building.
      Solution
      Phased demolition and firefighting tie-ins coordinated with building management.
      Outcome
      Handover complete, including automated glass and wall finishes.
    • Abu Dhabi · Commercial · 2026

      ADNEC Tower — 4th Floor

      Developer client · Complete fit-out package under the same coordinated multi-trade programme as the completed floors

      Constraint
      Third consecutive floor inside an operating tower.
      Solution
      Repeat programme, sequencing and QA/QC from the completed floors.
      Outcome
      On site; milestones tracked against programme.
    • Abu Dhabi · Commercial / Institutional · 2023–24

      Khalifa University

      Commercial client · Interior fit-out, civil support, gypsum partitions, decorative cladding, painting, finishing

      Constraint
      Operating university campus with facility and safety requirements enforced throughout.
      Solution
      Works sequenced around campus operations; compliance records maintained daily.
      Outcome
      Completed in full compliance with university facility standards.

    Related services · MEP Works · HVAC / AC · Aluminium & Glass · Strip-Out / Demolition

    Guides · Documented close-out · Occupied-tower programme · Owner checklist 2026 · Single contractor vs trades

    Request site visit

    Book a site visit

    An engineer visits, records constraints and photos, and a written scope follows. Dubai and Abu Dhabi first; other Emirates by arrangement.

    Reference issued on submit

    Invite Beavcon to tender

    Tender invitation

    Attach the tender documents or BOQ; an engineer confirms receipt and the submission date.

    .pdf .dwg .dxf .xlsx .xls .csv .doc .docx .jpg .png .zip · max 25 MB each · executable files rejected

    Reference issued on submit