Skip to content

The roles that hold a package — not a list of personal names.

Beavcon does not publish staff names on a marketing site. The named project engineer, QA lead and authority-submissions lead for your package are issued at award and belong in the contract. The structure below is what every enquiry is reviewed against, and what every guide on this site is reviewed against before it is published.

By Updated Reviewed by the Technical Manager Registered with the Society of Engineers UAE and Abu Dhabi Municipality

Role definitions updated · each role below has its own anchor, so a page can link the exact role that reviewed it

  • Registered with the Society of Engineers UAE and Abu Dhabi Municipality

    Technical Manager

    Reviews drawings, materials and authority submissions before a package is priced or installed. Holds the engineering decision on live-building isolations and close-out.

    Decisions this role owns

    • Drawings, materials and specification, reviewed before a package is priced
    • The authority submission route and what each approval needs
    • Isolation method on a live, occupied building
    • Engineering sign-off at close-out

    Subject areas

    • Engineering review
    • Authority submissions
    • Occupied-building fit-out
    • MEP coordination

    Reviews insights filed under Guide, Trade, Comparison

  • Delivery, HSE and quality on occupied sites

    Operations & Projects

    Runs programme, resources and permit-to-work on live towers and occupied communities. Owns the two-week lookahead and site records.

    Decisions this role owns

    • Programme, sequence and resourcing
    • Permit-to-work on live towers and occupied communities
    • The two-week lookahead issued to the client
    • Daily site records

    Subject areas

    • Programme control
    • Live-environment controls
    • HSE
    • ISO 45001

    Reviews insights filed under Process

  • Estimating, variations and documented cost control

    Commercial & QS

    Freezes scope and exclusions, checks BOQ line by line, and writes variations before they are executed. Issues the qualified technical-commercial offer.

    Decisions this role owns

    • Scope and exclusions, frozen before pricing
    • BOQ checked line by line
    • Variations written before they are executed
    • The qualified technical-commercial offer

    Subject areas

    • Construction estimating
    • BOQ
    • Variations
    • Cost visibility
  • ISO 9001, 14001 and 45001 inspection regime

    QA / QC & HSE

    Method statements, inspection and test plans, snag closure and the handover file. Permits-to-work and isolation records on occupied floors.

    Decisions this role owns

    • Method statements and inspection and test plans
    • Hold points and what has to be witnessed
    • Snag closure and the handover file
    • Isolation and permit records on occupied floors

    Subject areas

    • Documented close-out
    • QA/QC
    • ISO 9001
    • ISO 14001
    • ISO 45001

    Reviews insights filed under Prequalification

  • Site execution and single-point coordination

    Project Engineers

    One named engineer per package for landlord, consultant and trades. Daily records, inspection requests and as-built close-out.

    Decisions this role owns

    • One engineer per package as the single point for landlord, consultant and trades
    • Inspection requests and trade sequencing on site
    • Daily records against the lookahead
    • As-built close-out of the package

    Subject areas

    • Single-point accountability
    • Fit-out coordination
    • Villa renovation
    • As-built documentation
External references

Dubai Trade Licence No. 1277078. ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. Technical Manager registered with the Society of Engineers UAE and Abu Dhabi Municipality. Certificates are in the prequalification pack.

Contact

Send us the scope. We'll price it properly.

Upload RFQ WhatsApp
Hours
Mon–Sat · 08:00–22:00 GST
Web
www.beavcon.net

Request site visit

Book a site visit

An engineer visits, records constraints and photos, and a written scope follows. Dubai and Abu Dhabi first; other Emirates by arrangement.

Reference issued on submit

Invite Beavcon to tender

Tender invitation

Attach the tender documents or BOQ; an engineer confirms receipt and the submission date.

.pdf .dwg .dxf .xlsx .xls .csv .doc .docx .jpg .png .zip · max 25 MB each · executable files rejected

Reference issued on submit